NNP vs NDC- Government Promises and Development Projects

From WikiGrenada

NNP- era projects and their status.

[edit | edit source]

The following are some of the promises and developments of the New National Party from 2013-2022.They include projects that has been started, in progress and completed.

Project What the NNP administration reported Evidence-based assessment
Agricultural feeder roads Continued investment in roads serving farming communities Record individual phases separately and verify which sections were completed before 2022.
St. John's River Flood Mitigation The 2022 budget allocated EC$25 million toward completion in the following year The stated completion target extended into 2022- verify the final completion date before assigning credit.
Mt. Kumar Road EC$11.2 million contract; completion expected in April 2022 Listed as ongoing in the 2022 budget. A final completion record is needed.
Grenville Commercial Complex Construction had been delayed- bids were being reviewed The 2022 budget does not establish completion.
Western Main Road Corridor Upgrade The government reported contractor delays and a change of design consultancy firm The project was still awaiting construction to begin as described in the 2022 budget.
Molinere landslip rehabilitation Identified as part of the Western Main Road Corridor programme The project began in 2022 and was completed in 2024, so it must be recorded as a cross-administration project rather than an NNP-completed

[1] [2]

NDC- administration era projects andtheir status: 2022–October 2026

[edit | edit source]
Promise or development area What was provided or done Status and evidence
Free tertiary tuition Free tuition was introduced for students at T.A. Marryshow Community College (TAMCC) and the New Life Organization (NEWLO). Implemented

The 2025 Budget Statement confirms the programme and allocates further funding for continuation.

Free school meals A free hot meals programme was implemented for primary and secondary school students. Implemented

The 2025 budget confirms implementation and continued funding.

Minimum wage A national minimum wage adjustment was implemented in 2024. Implemented
New General Hospital ;Project Polaris The project moved to its official groundbreaking in Calivigny on 27 March 2026. The planned facility is a 250-bed hospital. Under construction
Molinere landslip rehabilitation Road reconstruction and slope stabilisation were undertaken to restore the affected section of the Western Road. Completed

The Ministry of Infrastructure records a start year of 2022 and completion in 2024. Because work began during the transition year, the record should identify both the project start and completion administrations. Source

Affordable housing The FROC 2024 Annual Report says retrofitting of the China-aided 600 affordable housing units was completed, and the units were being distributed. Retrofitting completed

This is a programme whose history spans administrations. Completion of retrofitting is not the same as proving that all units were newly constructed by the NDC.

Balthazar Bridge reconstruction The project was part of the Grenada Resilience Improvement Project. Contracts for reconstruction were signed in 2026. Underway

The 2026 report records the contracts and an expected 13-month period for civil works. Contract signing is not yet completed.

[3] [4] [5]