The following are some of the promises and developments of the New National Party from 2013-2022.They include projects that has been started, in progress and completed.
| Project
|
What the NNP administration reported
|
Evidence-based assessment
|
| Agricultural feeder roads
|
Continued investment in roads serving farming communities
|
Record individual phases separately and verify which sections were completed before 2022.
|
| St. John's River Flood Mitigation
|
The 2022 budget allocated EC$25 million toward completion in the following year
|
The stated completion target extended into 2022- verify the final completion date before assigning credit.
|
| Mt. Kumar Road
|
EC$11.2 million contract; completion expected in April 2022
|
Listed as ongoing in the 2022 budget. A final completion record is needed.
|
| Grenville Commercial Complex
|
Construction had been delayed- bids were being reviewed
|
The 2022 budget does not establish completion.
|
| Western Main Road Corridor Upgrade
|
The government reported contractor delays and a change of design consultancy firm
|
The project was still awaiting construction to begin as described in the 2022 budget.
|
| Molinere landslip rehabilitation
|
Identified as part of the Western Main Road Corridor programme
|
The project began in 2022 and was completed in 2024, so it must be recorded as a cross-administration project rather than an NNP-completed
|
[1] [2]
NDC- administration era projects andtheir status: 2022–October 2026
[edit | edit source]
| Promise or development area
|
What was provided or done
|
Status and evidence
|
| Free tertiary tuition
|
Free tuition was introduced for students at T.A. Marryshow Community College (TAMCC) and the New Life Organization (NEWLO).
|
Implemented
The 2025 Budget Statement confirms the programme and allocates further funding for continuation.
|
| Free school meals
|
A free hot meals programme was implemented for primary and secondary school students.
|
Implemented
The 2025 budget confirms implementation and continued funding.
|
| Minimum wage
|
A national minimum wage adjustment was implemented in 2024.
|
Implemented
|
| New General Hospital ;Project Polaris
|
The project moved to its official groundbreaking in Calivigny on 27 March 2026. The planned facility is a 250-bed hospital.
|
Under construction
|
| Molinere landslip rehabilitation
|
Road reconstruction and slope stabilisation were undertaken to restore the affected section of the Western Road.
|
Completed
The Ministry of Infrastructure records a start year of 2022 and completion in 2024. Because work began during the transition year, the record should identify both the project start and completion administrations. Source
|
| Affordable housing
|
The FROC 2024 Annual Report says retrofitting of the China-aided 600 affordable housing units was completed, and the units were being distributed.
|
Retrofitting completed
This is a programme whose history spans administrations. Completion of retrofitting is not the same as proving that all units were newly constructed by the NDC.
|
| Balthazar Bridge reconstruction
|
The project was part of the Grenada Resilience Improvement Project. Contracts for reconstruction were signed in 2026.
|
Underway
The 2026 report records the contracts and an expected 13-month period for civil works. Contract signing is not yet completed.
|
|
|
|
[3] [4] [5]